Exactly 70 years ago in October, 1945, the Lithuanian power system was put into operation. The operation of generators at the Kaunas and Vilnius power plants was synchronised after a power line connecting the power plants had been installed, and the balance between power generation and consumption was maintained by the central system control centre, the Lithuanian electricity transmission system operator Litgrid reports.